The Yas Marina rooftop solar project involved the design, supply, and installation of a high-density photovoltaic system across the circuit's expansive facility rooftops. GSI served as the full EPC contractor, managing every phase from structural assessment and system design through procurement, installation, commissioning, and grid connection.
Technical Highlights
- System Type: Rooftop grid-tied photovoltaic
- Location: Yas Marina Circuit, Abu Dhabi, UAE
- Contract Model: Full EPC turnkey
- Technology: High-efficiency monocrystalline modules with string inverters
- Grid Connection: Low-voltage injection with net metering
The installation required careful coordination with the circuit's operational schedule to ensure zero disruption to ongoing events and facility activities. GSI's engineering team developed a bespoke mounting solution compatible with the existing roof structure, ensuring structural integrity while maximising panel density and energy yield.
Sustainability Impact
The completed system significantly reduces the circuit's reliance on grid electricity, cutting carbon emissions and contributing to Abu Dhabi's Vision 2030 sustainability targets. The project demonstrates that even high-profile, operationally complex venues can integrate renewable energy without compromising performance or aesthetics.
GSI's Approach
GSI's project team conducted a detailed shading analysis and energy yield assessment prior to design finalisation, ensuring the system delivers optimal performance year-round given Abu Dhabi's solar irradiance profile. The team also implemented a remote monitoring platform, giving the client real-time visibility into generation data, system health, and CO₂ savings.
"Delivering a solar solution at a venue as prestigious as Yas Marina is a proud achievement for our team," said a GSI project director. "It demonstrates that renewable energy integration is achievable at any scale and in any environment — from open desert to world-famous motorsport circuits."
This project adds to GSI's expanding UAE portfolio and reinforces the company's capability to execute technically complex rooftop installations across the Gulf region.
Topics
Written by
GSI Communications Team